A fastener that passes incoming inspection and fails in service is the most expensive kind. Our control plan is built around the checks that predict field failures — dimensions, thread fit, hardness, coating thickness and, on request, torque coefficient.
This website does not display ISO 9001, ISO 14001, EN 14399 / EN 15048 factory production control or CE marking, because we do not hold those certificates. If your tender or your customer's specification requires them, tell us at enquiry stage — we will confirm in writing what we can and cannot supply before you build a quotation on it.
What we do supply is lot-level inspection data: dimensional reports, hardness and mechanical test results from an accredited third-party laboratory, coating thickness and salt spray reports, and mill certificates for the steel.
Three groups of checks, in the order they happen on the floor.
Thread go / no-go gauging, major diameter, head across flats, head height, length and thread run-out — measured with calibrated calipers, micrometers and thread gauges against the drawing or standard.
Head marking legibility, burrs, cracks after heading, plating uniformity and colour, and thread damage from handling. 100% visual sorting on critical orders, AQL sampling otherwise.
Hardness, proof load, tensile and wedge tensile testing — carried out by an accredited third-party laboratory, with the report issued in that laboratory's name so your customer can verify it independently.
You are not expected to take our word for a container. Any recognised inspection company can be appointed at your cost, and we will give them access to the finished goods, the packing area and the documents they ask for.
| Commercial invoice | Yes |
|---|---|
| Packing list | Yes, with lot numbers |
| Mill certificate | EN 10204 3.1 on request |
| Dimensional report | Per lot, measured values |
| Mechanical test report | Third-party lab, on request |
| Salt spray report | On request, 96 – 720 hours |
| Third-party inspection | Buyer nominated, buyer paid |
Each production lot is marked with a lot number and a heat number. That record links the finished part to the steel mill certificate, the heat treatment batch and the plating run — so if something is questioned a year later, we can go back to the source.
We welcome factory audits and third-party inspection. Send us your checklist and we will confirm what we can show you, and arrange a date.